POWER PLANTS
Yeşil Global Enerji’s initial energy investment and operations began in İstanbul, with the biggest Landfill Waste-to-Energy project in Europe.
KEY FACTS AND FIGURES
Waste-to-Energy
WtE PLANTS IN OPERATION: 4
Current number of WtE plants as of 2018. The total number of plants will increase to 6 by 2020.
TOTAL LANDFILL WASTE: 139m
Millions of tons of waste.
CURRENT TOTAL MW: 78,16
Current Capacity output from all WtE plants. The capacity will increase to 86,56 MW with 2 new plants and ORC investments.
ENERGY PLANTS UNDER CONSTRUCTION: 2
Further construction of two energy plants in İstanbul (Europe) with the initial capacity of 15,80 MW and İstanbul (Asia) with an initial capacity of 12,73 MW.
WASTE to ENERGY
Yeşil Global Enerji’s initial energy investment and operations began across 4 locations in Turkey, over 6 years. Currently, the group is developing two further LFG-WtE plants to expand operations to 6 plants, by 2020. Further investments in ORC (Organic Rankine Cycle) have began and will add an additional 8,4 MW capacity through all WtE plants
Location: Odayeri, Istanbul
Licensed Power: 33,80 MW
Installed Power: 33,80MW
Operation Date: December 2008
Location: Şile, Istanbul
Licensed Power: 19,81 MW
Installed Power: 19,81 MW
Operation Date: June 2009
Location: Kocaeli
Licensed Power: 2,1 MW
Installed Power: 2,1 MW
Operation Date: October 2015
Location: Göktürk, İstanbul
Licensed Power: 22,61 MW
Installed Power: 22,61 MW
Operation Date: October 2020
Location: Şile, İstanbul
Licensed Power: 43,80 MW
Installed Power: 14,15 MW
Operation Date: June 2021
Location: İzmit, Kocaeli
Technology: Piroliz & Syn Gas
Licensed Power: 40 MW
Waste Disposal Capacity: 2000 Tons / Day
Operation Date: December 2022